Pengcheng Wooden Easy-cutting Modular Construction Circular Column Formwork System

Pengcheng Wooden Easy-cutting Modular Construction Circular Column Formwork System
Product Detailed
1:easy-cutting 2:installation manually 3:smooth concrete surfaces without rework 4:save cost

Pengcheng Wooden Construction Circular Column Formwork System

Introduction

two piece of semi-circle film faced plywood panels with U.N slots at edges are connected seamlessly

and steel belts with screws reinforce it.

Usage

concrete forming of circular columns or pillars in construction.

Specification

Diameter(mm)Thickness(mm)Height(m)Pieces
200-550153 Max2
600-1200183 Max2
1250-1550223 Max2
1600-2200222.4 Max4-6

 P.S: the heights above 3m can be connected well by more pieces.

Features

1, light weight and easy installation

Selected high quality birch and poplar film faced plywood as raw materials, Pengcheng formwork

is light weight, high strength, and easy installation.

Example: Pengcheng formwork at 1000mm diameter and 3m height is about 40-45 kgs and 2 or 3

workers can install it well by hands. If to use steel formwork in the same size, it have to make use

of hoisting equipment.

2, accelerate the construction schedule and shorten the construction period

Normally, a group of workers (2 or 3 people) have installed about 10-15 circular columns within 8 hours, which will

save 70% construction period compared with steel circular column formwork.

3, easy-cutting, solve lintel problems between circular columns and beams

Pengcheng formwork can be cut according to architectural drawings and successfully solve connection between

circular columns and beams, which is more flexible than steel formwork.

4, perfect concrete surfaces without rework

5, lower cost

Pengcheng formwork is made of film faced plywood, shorter construction period, and lower labor cost. Best choice to replace traditional expensive steel circular column formwork.

Technical dates

No.TestingDates
1Moisture8-12%
2Bonding strength800mm1.27Mpa
1000mm1.36Mpa
3Bearing capacity800mm20.2KN/m²
1000mm18.9KN/m²

Installation

P.S: installation by dislocation above 3m height to add strength

       0.5cm-1cm above ground and reinforcement by concrete

       reinforcement by steel belts with screws every 20cm-30cm

       fixed by wooden blocks and scaffolding every 50cm-150cm 

      one times concrete forming within 7m height, two times concrete forming above 7m every 30-60 minutes

Maintain and Storage

keep the phenolic resin film well and clean the surfaces well after using it.

oil treament and 20mm above ground for long-time storage.

Shippment

Raw materials and Accessories

Raw materialFilm faced plywoodCore: birch and poplar
Glue: waterproof melamine
Film: brown film
Hot pressing: two times
Surface treatment: sanding
Edges: U.N slots by cutting machine
AccessoriesSteel beltsSteel No.: Q235
Width: 3.2cm
Thickness: 1.2mm
Extension strength: 650Mpa/mm²
Extension length: ≤4mm/m
Screws8.8 grade M12

Compare

Itemspengcheng formworksteel formworkPVC formworkDIY wooden strip formwork
Performancelightweight,strong resistance to pressure, good insulation and air permeabilitysolid and durable, but heavy weight, bad insulation and air permeabilitylightweight, but bad insulation and air permeabilitybad insulationand air permeability
Installationby hands, only 1 daysby hoisting equipment, about 4 daysby hoisting equipment, difficult for dismountingdifficult for assembling wooden strips
Cutyes, solve connection problem between circular columns and beamsno, the flexbility is badyes, but bigger joint-cuttingno
Construction periodonly 4 daysabout 15 daysabout 7 days, lower percent of passabout 15 days,lower percent of pass
Costmade from film faced plywood, short construction period, don't need hoisting equipment, economical and practicalmade from steel plates, operation by hoisting equipment, expensivemade from PVC, cheaphigh labor cost

Analysis of construction projects

Take the example of Tai’an Culture and Art Center Project: the diameter of its circular columns have 400mm, 700mm, 800mm, 900mm, and 1200mm, different heights from 3m to 6m, 800 circular columns in totally.

Through our PENGCHENG formwork, it only takes 5 days. The total cost is about USD 110,000.00.

If to make use of STEEL formwork, it will need 15 days and the cost will be USD260,000.00, including the expense of hoisting equipment.

If to take advantage of  PVC formwork or DIY wooden strip formwork, they can’t guarantee the construction period.

Gallery

Other products

Factory

Certificate

Contact



Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.